In
the final arrangement, these satellite artworks were dropped due to the
new location. The
commission was awarded on the strength of this design. The
considerable delay between the commission being awarded and commencement
of works was due to the sculpture being scheduled with the third phase of
housing on site. When
detailed design was begun, structural
analysis of the design (for wind loading, stability, etc.) required a 3D wireframe CAD version to be
made: 
This was also very useful in fabricating the sculpture, to help set out
the angle of the towers. Using the CAD design, a laser-cut acrylic scale model was made to
help plan the spiral surface. |